Projects

Within a very short time frame, the company has gathered working experience in different sectors of Engineering and has performed its duties with utmost responsibility, which has been appreciated by the clients and service receivers. We are determined to provide such quality and timely delivery of works for the satisfaction of our valuable clients.

The work experiences of the company are listed as below:

S.N.Name of the ProjectTime of CompletionClientLocationFiscal Year
1.      Preparation of Detailed Project Report of Shikharbesi Multipurpose Dam Project2079/03/15Water Resources & Irrigation Development DivisionGorkha, Nepal2078/79
2.Detailed Feasibility Study of Taalpokhari Multipurpose Reservoir Project2079/03/18Water Resources & Irrigation Development DivisionGorkha, Nepal2078/79
3.Sub-consulting Services for Super Budhigandaki HEP (Peaking Run of River Type Project)On goingTechnoquarry – BEAM – NEDCGorkha, Nepal2079/80
4.Feasibility Study, Initial Environment Examination and Detailed Engineering Design of Civil Components for Nwagad Hydropower Project (10 MW)Feasibility Study Completed on 2080/02/28 and remaining works ongoingGwallek Power Pvt. Ltd.Darchula, Nepal2079/80
5.Updated Feasibility Study, Initial Environment Examination and Detailed Engineering Design of Lower Ingwa Khola Hydropower Project (8 MW)On goingIngwa Hydropower LimitedPanchthar, Nepal2079/80
6.Feasibility Study, Supplementary Initial Environment Examination and Detailed Engineering Design of Trishuli Galchi Hydropower Project (30 MW)On goingApi Power Company LimitedNuwakot, Nepal2079/80